Operational Consulting
Operations are run by numbers, not by feel: we measure, we find the bottleneck, we cut cost and lead time.
Sound familiar?
It could be like this
First operations are measured: the duration, cost and error rate of every step come out of the data. The bottleneck is not guessed, it is located. Then quick wins are applied on site and the result is tracked on a KPI dashboard — the improvement lasts.
What We Do
From the field to the data, from the data to lasting improvement.
Operations X-Ray
Order, production, warehouse and shipping flows are measured end to end; where the waiting happens is shown in numbers.
Stock & Supply Discipline
Safety stock, reorder points and lead times are recalculated; both stockouts and dead stock go down.
Warehouse & Shipping Efficiency
Layout, picking routes and dispatch planning are simplified; the same team ships more orders.
Capacity & Planning
Machine, team and shift capacity are planned with real data; rush-job congestion drops.
Cost & Waste Analysis
Unit cost, scrap and rework are separated out; profit leakage becomes visible.
Operations KPI Dashboard
OTIF, stock turnover, order cycle time and scrap rate are tracked on a single Power BI screen.
Our Working Process
Site Visit
Operations are observed on site; we talk to the warehouse, production and shipping teams.
Data Collection
ERP, warehouse and sales data are pulled; what people describe is compared with the numbers.
Bottleneck Analysis
The steps that create time, cost and error are prioritised and reported.
Improvement Plan
Quick wins and mid-term structural steps are defined together with a timeline.
Rollout & Follow-up
Changes are applied on site and tracked with KPIs for three months.
Frequently Asked Questions
Is this only a report, or do you implement as well?
Both. A report alone does not change the work; we roll the improvements out on site together with your team.
Will we have to buy new software?
Not necessarily. First we put the unused side of your current system to work; if something is genuinely missing, we say so impartially.
How long until we see results?
Quick wins are usually visible in the first 4-6 weeks. Structural changes settle in within 3-6 months.
Which industries do you work with?
We have over 18 years of field experience in manufacturing, distribution, warehousing and retail supply operations.
Will this disrupt our team's work?
We plan it so it does not. Meetings are kept short and measurement happens without stopping the flow of work.
Let's measure your operation together.
Numbers first, decisions second — stop managing on guesswork.
Get a Quote